PL 159 G
ActiveProduction period
Production licence 159 G was granted 01.03.2019. It is in its production period and valid to 03.03.2029. Equinor Energy AS is the operator, with three licensees in all.
Granted01.03.2019
Valid to03.03.2029
PhaseProduction period
Licensing roundTFO2018
Area granted3 km²
Area now3 km²
Main areaNorwegian Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 53 % |
| DNO Norge AS | 32 % |
| ORLEN Upstream Norway AS | 15 % |
Wellbores
No wellbore in the register is drilled in PL 159 G.
Licensees over time
6 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | Equinor Energy AS ; DNO Norge AS ; ORLEN Upstream Norway AS |
| 26.09.2024 | 16.12.2025 | Equinor Energy AS ; DNO Norge AS (old) ; ORLEN Upstream Norway AS |
| 30.09.2021 | 25.09.2024 | Equinor Energy AS ; DNO Norge AS (old) ; PGNiG Upstream Norway AS |
| 19.12.2019 | 29.09.2021 | Equinor Energy AS ; DNO Norge AS (old) ; INEOS E&P Norge AS |
| 21.06.2019 | 18.12.2019 | Equinor Energy AS ; DNO North Sea (Norge) AS ; INEOS E&P Norge AS |
| 01.03.2019 | 20.06.2019 | Equinor Energy AS ; INEOS E&P Norge AS |