WellplannerNorwegian shelf well data

Fields / Licences / PL 167 C

PL 167 C

ActiveProduction period

Production licence 167 C was granted 02.03.2018. It is in its production period and valid to 01.03.2030. Aker BP ASA is the operator, with three licensees in all.

Granted02.03.2018
Valid to01.03.2030
PhaseProduction period
Licensing roundTFO2017
Area granted13 km²
Area now13 km²
Main areaNorth Sea
OperatorAker BP ASA

Licensees

CompanyInterest
Aker BP ASA operator50 %
Equinor Energy AS30 %
DNO Norge AS20 %

Wellbores

No wellbore in the register is drilled in PL 167 C.

Licensees over time

11 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.

Show the history
FromToLicensees and interests
17.12.2025-Aker BP ASA ; Equinor Energy AS ; DNO Norge AS
01.01.202316.12.2025Aker BP ASA ; Equinor Energy AS ; Sval Energi AS
30.06.202231.12.2022ABP Norway AS ; Equinor Energy AS ; Sval Energi AS ; Aker BP ASA
31.05.202229.06.2022Lundin Energy Norway AS ; Equinor Energy AS ; Sval Energi AS ; Aker BP ASA
30.04.202130.05.2022Lundin Energy Norway AS ; Equinor Energy AS ; Spirit Energy Norway AS ; Aker BP ASA
01.04.202029.04.2021Equinor Energy AS ; Lundin Energy Norway AS ; Spirit Energy Norway AS
04.12.201831.03.2020Equinor Energy AS ; Lundin Norway AS ; Spirit Energy Norway AS
30.11.201803.12.2018Equinor Energy AS ; Lundin Norway AS ; Spirit Energy Norge AS
31.08.201829.11.2018Equinor Energy AS ; Lundin Norway AS ; Spirit Energy Norge AS
16.05.201830.08.2018Equinor Energy AS ; Lundin Norway AS
02.03.201815.05.2018Statoil Petroleum AS ; Lundin Norway AS

Operators over time

OperatorFromTo
Aker BP ASA01.01.2023-
ABP Norway AS30.06.202231.12.2022
Lundin Energy Norway AS30.04.202129.06.2022
Equinor Energy AS16.05.201829.04.2021
Statoil Petroleum AS02.03.201815.05.2018
Open on FactPages ↗Every licence