PL 167 C
ActiveProduction period
Production licence 167 C was granted 02.03.2018. It is in its production period and valid to 01.03.2030. Aker BP ASA is the operator, with three licensees in all.
Granted02.03.2018
Valid to01.03.2030
PhaseProduction period
Licensing roundTFO2017
Area granted13 km²
Area now13 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 50 % |
| Equinor Energy AS | 30 % |
| DNO Norge AS | 20 % |
Wellbores
No wellbore in the register is drilled in PL 167 C.
Licensees over time
11 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | Aker BP ASA ; Equinor Energy AS ; DNO Norge AS |
| 01.01.2023 | 16.12.2025 | Aker BP ASA ; Equinor Energy AS ; Sval Energi AS |
| 30.06.2022 | 31.12.2022 | ABP Norway AS ; Equinor Energy AS ; Sval Energi AS ; Aker BP ASA |
| 31.05.2022 | 29.06.2022 | Lundin Energy Norway AS ; Equinor Energy AS ; Sval Energi AS ; Aker BP ASA |
| 30.04.2021 | 30.05.2022 | Lundin Energy Norway AS ; Equinor Energy AS ; Spirit Energy Norway AS ; Aker BP ASA |
| 01.04.2020 | 29.04.2021 | Equinor Energy AS ; Lundin Energy Norway AS ; Spirit Energy Norway AS |
| 04.12.2018 | 31.03.2020 | Equinor Energy AS ; Lundin Norway AS ; Spirit Energy Norway AS |
| 30.11.2018 | 03.12.2018 | Equinor Energy AS ; Lundin Norway AS ; Spirit Energy Norge AS |
| 31.08.2018 | 29.11.2018 | Equinor Energy AS ; Lundin Norway AS ; Spirit Energy Norge AS |
| 16.05.2018 | 30.08.2018 | Equinor Energy AS ; Lundin Norway AS |
| 02.03.2018 | 15.05.2018 | Statoil Petroleum AS ; Lundin Norway AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Aker BP ASA | 01.01.2023 | - |
| ABP Norway AS | 30.06.2022 | 31.12.2022 |
| Lundin Energy Norway AS | 30.04.2021 | 29.06.2022 |
| Equinor Energy AS | 16.05.2018 | 29.04.2021 |
| Statoil Petroleum AS | 02.03.2018 | 15.05.2018 |