PL 187 B
ActiveProduction period
Production licence 187 B was granted 06.05.2026. It is in its production period and valid to 10.09.2032. Equinor Energy AS is the operator, with two licensees in all.
Granted06.05.2026
Valid to10.09.2032
PhaseProduction period
Licensing round14
Area granted2 km²
Area now2 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 75 % |
| Vår Energi ASA | 25 % |
Wellbores
No wellbore in the register is drilled in PL 187 B.
Licensees over time
2 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 30.06.2026 | - | Equinor Energy AS ; Vår Energi ASA |
| 06.05.2026 | 29.06.2026 | Equinor Energy AS ; Vår Energi ASA ; OMV Norge AS ; Repsol Norge AS |