PL 229 E
ActiveProduction period
Production licence 229 E was granted 30.11.2018. It is in its production period and valid to 15.05.2042. Vår Energi ASA is the operator, with two licensees in all.
Granted30.11.2018
Valid to15.05.2042
PhaseProduction period
Licensing roundBARENTSHAVPROSJEKTET-97
Area granted38 km²
Area now38 km²
Main areaBarents Sea
OperatorVår Energi ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA | 50 % |
| Vår Energi ASA operator | 50 % |
Wellbores drilled in PL 229 E
1 wellbores, 1 of them exploration, newest first.
| Wellbore | Field | Type | Status | Total depth, m | Spud |
|---|---|---|---|---|---|
| 7122/9-1 | - | Exploration | Plugged and abandoned | 1 939,0 | 23.11.2022 |
Licensees over time
8 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 01.01.2023 | - | Aker BP ASA ; Vår Energi ASA |
| 30.06.2022 | 31.12.2022 | ABP Norway AS ; Vår Energi ASA |
| 28.01.2022 | 29.06.2022 | Lundin Energy Norway AS ; Vår Energi ASA |
| 15.12.2020 | 27.01.2022 | Lundin Energy Norway AS ; Vår Energi AS |
| 14.10.2020 | 14.12.2020 | Vår Energi AS |
| 29.03.2019 | 13.10.2020 | Equinor Energy AS ; Vår Energi AS |
| 10.12.2018 | 28.03.2019 | Vår Energi AS ; Equinor Energy AS |
| 30.11.2018 | 09.12.2018 | Eni Norge AS ; Equinor Energy AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Vår Energi ASA | 28.01.2022 | - |
| Vår Energi AS | 10.12.2018 | 27.01.2022 |
| Eni Norge AS | 30.11.2018 | 09.12.2018 |