PL 242 B
ActiveInitial period
Production licence 242 B was granted 14.03.2025. It is in its initial period and valid to 14.03.2032. Aker BP ASA is the operator, with three licensees in all.
Granted14.03.2025
Valid to14.03.2032
PhaseInitial period
Licensing roundTFO2024
Area granted5 km²
Area now5 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS | 50 % |
| Aker BP ASA operator | 35 % |
| DNO Norge AS | 15 % |
Wellbores
No wellbore in the register is drilled in PL 242 B.
Licensees over time
2 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | Equinor Energy AS ; Aker BP ASA ; DNO Norge AS |
| 14.03.2025 | 16.12.2025 | Equinor Energy AS ; Aker BP ASA ; Sval Energi AS |