PL 248 D
ActiveProduction period
Production licence 248 D was granted 18.06.2014. It is in its production period and valid to 04.06.2035. Equinor Energy AS is the operator, with two licensees in all.
Granted18.06.2014
Valid to04.06.2035
PhaseProduction period
Licensing roundNST99
Area granted14 km²
Area now14 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 60 % |
| Petoro AS | 40 % |
Petoro AS holds the share of the State's Direct Financial Interest (SDFI).
Wellbores
No wellbore in the register is drilled in PL 248 D.
Licensees over time
2 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 16.05.2018 | - | Equinor Energy AS ; Petoro AS |
| 18.06.2014 | 15.05.2018 | Statoil Petroleum AS ; Petoro AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Equinor Energy AS | 16.05.2018 | - |
| Statoil Petroleum AS | 18.06.2014 | 15.05.2018 |