WellplannerNorwegian shelf well data

Fields / Licences / PL 248 I

PL 248 I

ActiveProduction period

Production licence 248 I was granted 18.12.2017. It is in its production period and valid to 04.06.2035. Equinor Energy AS is the operator, with four licensees in all.

Granted18.12.2017
Valid to04.06.2035
PhaseProduction period
Licensing roundNST99
Area granted48 km²
Area now34 km²
Main areaNorth Sea
OperatorEquinor Energy AS

Licensees

CompanyInterest
Petoro AS40 %
Equinor Energy AS operator36 %
Aker BP ASA19 %
Wellesley Petroleum AS5 %

Petoro AS holds the share of the State's Direct Financial Interest (SDFI).

Wellbores drilled in PL 248 I

2 wellbores, 2 of them exploration, newest first.

WellboreFieldTypeStatusTotal depth, mSpud
35/11-21 A-ExplorationPlugged and abandoned2 931,006.09.2018
35/11-21 S-ExplorationPlugged and abandoned2 800,026.07.2018

Licensees over time

6 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.

Show the history
FromToLicensees and interests
30.09.2026-Petoro AS ; Equinor Energy AS ; Aker BP ASA ; Wellesley Petroleum AS
31.05.202329.09.2026Equinor Energy AS ; Petoro AS ; Wellesley Petroleum AS
29.10.202130.05.2023Equinor Energy AS ; Petoro AS ; Wellesley Petroleum AS
29.06.201828.10.2021Wellesley Petroleum AS ; Petoro AS
29.12.201728.06.2018Petoro AS ; Wellesley Petroleum AS ; Capricorn Norge AS
18.12.201728.12.2017Petoro AS ; Statoil Petroleum AS ; Capricorn Norge AS ; Wellesley Petroleum AS

Operators over time

OperatorFromTo
Equinor Energy AS13.11.2021-
Wellesley Petroleum AS20.12.201712.11.2021
Statoil Petroleum AS18.12.201719.12.2017
Open on FactPages ↗Every licence