PL 272 B
ActiveProduction period, extended
Production licence 272 B was granted 01.03.2019. It is in its production period (extended) and valid to 31.12.2052. Aker BP ASA is the operator, with two licensees in all.
Granted01.03.2019
Valid to31.12.2052
PhaseProduction period, extended
Licensing roundTFO2018
Area granted44 km²
Area now44 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 50 % |
| Equinor Energy AS | 50 % |
Wellbores drilled in PL 272 B
3 wellbores, 3 of them exploration, newest first.
Operators over time
| Operator | From | To |
|---|---|---|
| Aker BP ASA | 12.12.2022 | - |
| Equinor Energy AS | 01.03.2019 | 11.12.2022 |