PL 272 D
ActiveProduction period
Production licence 272 D was granted 17.02.2023. It is in its production period and valid to 31.12.2052. Aker BP ASA is the operator, with two licensees in all.
Granted17.02.2023
Valid to31.12.2052
PhaseProduction period
Licensing roundTFO2022
Area granted95 km²
Area now95 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 50 % |
| Equinor Energy AS | 50 % |
Wellbores
No wellbore in the register is drilled in PL 272 D.