PL 272 E
ActiveInitial period
Production licence 272 E was granted 15.03.2024. It is in its initial period and valid to 31.12.2029. Aker BP ASA is the operator, with two licensees in all.
Granted15.03.2024
Valid to31.12.2029
PhaseInitial period
Licensing roundTFO2023
Area granted24 km²
Area now24 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 50 % |
| Equinor Energy AS | 50 % |
Wellbores
No wellbore in the register is drilled in PL 272 E.