PL 300
ActiveProduction period, extended
Production licence 300 was granted 12.12.2003. It is in its production period (extended) and valid to 01.01.2029. Aker BP ASA is the operator, with two licensees in all.
Granted12.12.2003
Valid to01.01.2029
PhaseProduction period, extended
Licensing roundTFO2003
Area granted21 km²
Area now9 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 55 % |
| DNO Norge AS | 45 % |
Fields
Part of Tambar Øst lies in this licence.
Wellbores
No wellbore in the register is drilled in PL 300.
Licensees over time
6 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | Aker BP ASA ; DNO Norge AS |
| 19.12.2019 | 16.12.2025 | Aker BP ASA ; DNO Norge AS (old) |
| 21.05.2019 | 18.12.2019 | Aker BP ASA ; DNO North Sea (Norge) AS |
| 30.11.2016 | 20.05.2019 | Aker BP ASA ; Faroe Petroleum Norge AS |
| 06.09.2006 | 29.11.2016 | BP Norge AS ; DONG E&P Norge AS |
| 12.12.2003 | 05.09.2006 | BP Norge AS ; DONG Norge AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Aker BP ASA | 30.11.2016 | - |
| BP Norge AS | 12.12.2003 | 29.11.2016 |