PL 309 C
ActiveProduction period
Production licence 309 C was granted 06.10.2011. It is in its production period and valid to 01.03.2031. Equinor Energy AS is the operator, with three licensees in all.
Granted06.10.2011
Valid to01.03.2031
PhaseProduction period
Licensing roundTFO2003
Area granted185 km²
Area now27 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 63,817 % |
| Petoro AS | 33,600 % |
| ConocoPhillips Skandinavia AS | 2,583 % |
Petoro AS holds the share of the State's Direct Financial Interest (SDFI).
Wellbores
No wellbore in the register is drilled in PL 309 C.
Licensees over time
2 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 16.05.2018 | - | Equinor Energy AS ; Petoro AS ; ConocoPhillips Skandinavia AS |
| 06.10.2011 | 15.05.2018 | Statoil Petroleum AS ; Petoro AS ; ConocoPhillips Skandinavia AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Equinor Energy AS | 16.05.2018 | - |
| Statoil Petroleum AS | 06.10.2011 | 15.05.2018 |