WellplannerNorwegian shelf well data

Fields / Licences / PL 338 BS

PL 338 BS

ActiveProduction period, extendedDepth-limited in all or part

Production licence 338 BS was granted 17.09.2014. It is in its production period (extended) and valid to 31.12.2036. Aker BP ASA is the operator, with three licensees in all.

Granted17.09.2014
Valid to31.12.2036
PhaseProduction period, extended
Licensing roundTFO2004
Area granted5 km²
Area now5 km²
Main areaNorth Sea
OperatorAker BP ASA

Licensees

CompanyInterest
Aker BP ASA operator50 %
OKEA ASA35 %
Equinor Energy AS15 %

Fields

Part of Ivar Aasen lies in this licence.

Wellbores

No wellbore in the register is drilled in PL 338 BS.

Licensees over time

9 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.

Show the history
FromToLicensees and interests
01.01.2023-Aker BP ASA ; OKEA ASA ; Equinor Energy AS
01.11.202231.12.2022ABP Norway AS ; OKEA ASA ; Equinor Energy AS
30.06.202231.10.2022ABP Norway AS ; OKEA ASA ; Equinor Energy AS ; Wintershall Dea Norge AS
01.04.202029.06.2022Lundin Energy Norway AS ; OKEA ASA ; Equinor Energy AS ; Wintershall Dea Norge AS
13.11.201931.03.2020Lundin Norway AS ; OKEA ASA ; Equinor Energy AS ; Wintershall Dea Norge AS
16.05.201912.11.2019Lundin Norway AS ; OKEA ASA ; Equinor Energy AS ; Wintershall Norge AS
16.05.201815.05.2019Lundin Norway AS ; OKEA AS ; Equinor Energy AS ; Wintershall Norge AS
08.07.201615.05.2018Lundin Norway AS ; OKEA AS ; Statoil Petroleum AS ; Wintershall Norge AS
17.09.201407.07.2016Lundin Norway AS ; OMV (Norge) AS ; Statoil Petroleum AS ; Wintershall Norge AS

Operators over time

OperatorFromTo
Aker BP ASA01.01.2023-
ABP Norway AS30.06.202231.12.2022
Lundin Energy Norway AS01.04.202029.06.2022
Lundin Norway AS17.09.201431.03.2020
Open on FactPages ↗Every licence