PL 338 F
ActiveProduction period
Production licence 338 F was granted 24.06.2024. It is in its production period and valid to 17.12.2029. Aker BP ASA is the operator, with three licensees in all.
Granted24.06.2024
Valid to17.12.2029
PhaseProduction period
Licensing roundTFO2004
Area granted5 km²
Area now5 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 65 % |
| OMV Norge AS | 20 % |
| Harbour Energy Norge AS | 15 % |
Wellbores
No wellbore in the register is drilled in PL 338 F.
Licensees over time
4 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 01.09.2025 | - | Aker BP ASA ; OMV Norge AS ; Harbour Energy Norge AS |
| 23.12.2024 | 31.08.2025 | Aker BP ASA ; OMV (Norge) AS ; Harbour Energy Norge AS |
| 01.09.2024 | 22.12.2024 | Aker BP ASA ; OMV (Norge) AS ; Wintershall Dea Norge AS |
| 24.06.2024 | 31.08.2024 | Aker BP ASA ; OMV (Norge) AS |