PL 501 B
ActiveProduction period
Production licence 501 B was granted 04.02.2011. It is in its production period and valid to 31.12.2036. Aker BP ASA is the operator, with three licensees in all.
Granted04.02.2011
Valid to31.12.2036
PhaseProduction period
Licensing roundTFO2010
Area granted86 km²
Area now29 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS | 42,616 % |
| Aker BP ASA operator | 37,384 % |
| TotalEnergies EP Norge AS | 20,000 % |
Fields
Part of Johan Sverdrup lies in this licence.
Wellbores
No wellbore in the register is drilled in PL 501 B.
Licensees over time
8 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 01.01.2023 | - | Equinor Energy AS ; Aker BP ASA ; TotalEnergies EP Norge AS |
| 30.06.2022 | 31.12.2022 | Equinor Energy AS ; ABP Norway AS ; TotalEnergies EP Norge AS |
| 18.06.2021 | 29.06.2022 | Equinor Energy AS ; Lundin Energy Norway AS ; TotalEnergies EP Norge AS |
| 01.04.2020 | 17.06.2021 | Equinor Energy AS ; Lundin Energy Norway AS ; Total E&P Norge AS |
| 30.08.2019 | 31.03.2020 | Equinor Energy AS ; Lundin Norway AS ; Total E&P Norge AS |
| 16.05.2018 | 29.08.2019 | Equinor Energy AS ; Lundin Norway AS ; Total E&P Norge AS |
| 14.05.2018 | 15.05.2018 | Lundin Norway AS ; Statoil Petroleum AS ; Total E&P Norge AS |
| 04.02.2011 | 13.05.2018 | Lundin Norway AS ; Statoil Petroleum AS ; Maersk Oil Norway AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Aker BP ASA | 01.01.2023 | - |
| ABP Norway AS | 30.06.2022 | 31.12.2022 |
| Lundin Energy Norway AS | 01.04.2020 | 29.06.2022 |
| Lundin Norway AS | 04.02.2011 | 31.03.2020 |