PL 537 B
ActiveProduction period
Production licence 537 B was granted 22.06.2018. It is in its production period and valid to 15.05.2049. Equinor Energy AS is the operator, with four licensees in all.
Granted22.06.2018
Valid to15.05.2049
PhaseProduction period
Licensing round24
Area granted10 km²
Area now4 km²
Main areaBarents Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 42,5 % |
| Aker BP ASA | 27,5 % |
| Petoro AS | 20,0 % |
| INPEX Idemitsu Norge AS | 10,0 % |
Petoro AS holds the share of the State's Direct Financial Interest (SDFI).
Wellbores
No wellbore in the register is drilled in PL 537 B.
Licensees over time
7 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 30.09.2026 | - | Equinor Energy AS ; Aker BP ASA ; Petoro AS ; INPEX Idemitsu Norge AS |
| 01.01.2023 | 29.09.2026 | Aker BP ASA ; Equinor Energy AS ; Petoro AS ; INPEX Idemitsu Norge AS |
| 30.06.2022 | 31.12.2022 | ABP Norway AS ; Equinor Energy AS ; Petoro AS ; INPEX Idemitsu Norge AS |
| 31.01.2022 | 29.06.2022 | Equinor Energy AS ; Lundin Energy Norway AS ; Petoro AS ; INPEX Idemitsu Norge AS |
| 17.12.2021 | 30.01.2022 | Equinor Energy AS ; Lundin Energy Norway AS ; Petoro AS ; Idemitsu Petroleum Norge AS |
| 30.11.2020 | 16.12.2021 | Equinor Energy AS ; OMV (Norge) AS ; Petoro AS ; Idemitsu Petroleum Norge AS ; Lundin Energy Norway AS |
| 22.06.2018 | 29.11.2020 | Equinor Energy AS ; OMV (Norge) AS ; Idemitsu Petroleum Norge AS ; Petoro AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Equinor Energy AS | 01.12.2019 | - |
| OMV (Norge) AS | 22.06.2018 | 30.11.2019 |