PL 630 CS
InactiveDepth-limited in all or part
Production licence 630 CS was granted 17.02.2023. It ended 16.02.2025. The last operator was Equinor Energy AS.
Granted17.02.2023
Ended16.02.2025
Phase-
Licensing roundTFO2022
Area granted45 km²
Area now-
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees when it ended
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 95 % |
| Wellesley Petroleum AS | 5 % |
Wellbores
No wellbore in the register is drilled in PL 630 CS.
Licensees over time
2 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 31.05.2023 | 16.02.2025 | Equinor Energy AS ; Wellesley Petroleum AS |
| 17.02.2023 | 30.05.2023 | Equinor Energy AS ; Wellesley Petroleum AS |