PL 825
Inactive
Production licence 825 was granted 05.02.2016. It ended 05.02.2020. The last operator was DNO Norge AS (old).
Granted05.02.2016
Ended05.02.2020
Phase-
Licensing roundTFO2015
Area granted78 km²
Area now-
Main areaNorth Sea
OperatorDNO Norge AS (old)
Licensees when it ended
| Company | Interest |
|---|---|
| DNO Norge AS (old) operator | 50 % |
| Equinor Energy AS | 30 % |
| Spirit Energy Norway AS | 20 % |
Wellbores drilled in PL 825
1 wellbores, 1 of them exploration, newest first.
| Wellbore | Field | Type | Status | Total depth, m | Spud |
|---|---|---|---|---|---|
| 30/6-30 | - | Exploration | Plugged and abandoned | 3 493,0 | 19.10.2018 |
Licensees over time
8 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 19.12.2019 | 05.02.2020 | DNO Norge AS (old) ; Equinor Energy AS ; Spirit Energy Norway AS |
| 21.05.2019 | 18.12.2019 | DNO North Sea (Norge) AS ; Equinor Energy AS ; Spirit Energy Norway AS ; DNO Norge AS (old) |
| 21.12.2018 | 20.05.2019 | Faroe Petroleum Norge AS ; Equinor Energy AS ; Spirit Energy Norway AS ; DNO Norge AS (old) |
| 04.12.2018 | 20.12.2018 | Faroe Petroleum Norge AS ; Lundin Norway AS ; Spirit Energy Norway AS ; DNO Norge AS (old) ; Equinor Energy AS |
| 30.11.2018 | 03.12.2018 | Faroe Petroleum Norge AS ; Lundin Norway AS ; Spirit Energy Norge AS ; DNO Norge AS (old) ; Equinor Energy AS |
| 15.02.2018 | 29.11.2018 | Faroe Petroleum Norge AS ; Lundin Norway AS ; Spirit Energy Norge AS |
| 22.12.2017 | 14.02.2018 | Faroe Petroleum Norge AS ; Fortis Petroleum Norway AS ; Spirit Energy Norge AS |
| 05.02.2016 | 21.12.2017 | Faroe Petroleum Norge AS ; Centrica Resources (Norge) AS ; Fortis Petroleum Norway AS |
Operators over time
| Operator | From | To |
|---|---|---|
| DNO Norge AS (old) | 19.12.2019 | 05.02.2020 |
| DNO North Sea (Norge) AS | 21.05.2019 | 18.12.2019 |
| Faroe Petroleum Norge AS | 05.02.2016 | 20.05.2019 |