PL 878 B
ActiveInitial period, extended
Production licence 878 B was granted 19.02.2021. It is in its initial period (extended) and valid to 10.02.2027. Equinor Energy AS is the operator, with four licensees in all.
Granted19.02.2021
Valid to10.02.2027
PhaseInitial period, extended
Licensing roundTFO2020
Area granted7 km²
Area now7 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 56 % |
| ORLEN Upstream Norway AS | 20 % |
| DNO Norge AS | 19 % |
| Wellesley Petroleum AS | 5 % |
Wellbores
No wellbore in the register is drilled in PL 878 B.
Licensees over time
7 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 29.05.2026 | - | Equinor Energy AS ; ORLEN Upstream Norway AS ; DNO Norge AS ; Wellesley Petroleum AS |
| 30.06.2025 | 28.05.2026 | Equinor Energy AS ; ORLEN Upstream Norway AS ; Wellesley Petroleum AS |
| 26.09.2024 | 29.06.2025 | Equinor Energy AS ; ORLEN Upstream Norway AS |
| 30.08.2024 | 25.09.2024 | Equinor Energy AS ; PGNiG Upstream Norway AS |
| 31.05.2023 | 29.08.2024 | Equinor Energy AS ; Source Energy AS |
| 29.10.2021 | 30.05.2023 | Equinor Energy AS ; Wellesley Petroleum AS ; Source Energy AS |
| 19.02.2021 | 28.10.2021 | Equinor Energy AS ; Source Energy AS ; Wellesley Petroleum AS |