PL 878 C
Inactive
Production licence 878 C was granted 11.03.2022. It ended 14.03.2026. The last operator was Equinor Energy AS.
Granted11.03.2022
Ended14.03.2026
Phase-
Licensing roundTFO2021
Area granted86 km²
Area now-
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees when it ended
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 75 % |
| ORLEN Upstream Norway AS | 20 % |
| Wellesley Petroleum AS | 5 % |
Wellbores
No wellbore in the register is drilled in PL 878 C.
Licensees over time
5 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 30.06.2025 | 14.03.2026 | Equinor Energy AS ; ORLEN Upstream Norway AS ; Wellesley Petroleum AS |
| 26.09.2024 | 29.06.2025 | Equinor Energy AS ; ORLEN Upstream Norway AS |
| 30.08.2024 | 25.09.2024 | Equinor Energy AS ; PGNiG Upstream Norway AS |
| 31.05.2023 | 29.08.2024 | Equinor Energy AS ; Source Energy AS |
| 11.03.2022 | 30.05.2023 | Equinor Energy AS ; Wellesley Petroleum AS ; Source Energy AS |