PL 901
Inactive
Production licence 901 was granted 10.02.2017. It ended 10.02.2024. The last operator was Vår Energi ASA.
Granted10.02.2017
Ended10.02.2024
Phase-
Licensing roundTFO2016
Area granted278 km²
Area now-
Main areaBarents Sea
OperatorVår Energi ASA
Licensees when it ended
| Company | Interest |
|---|---|
| Vår Energi ASA operator | 50 % |
| Concedo AS | 20 % |
| Longboat Japex Norge AS | 20 % |
| Equinor Energy AS | 10 % |
Wellbores drilled in PL 901
2 wellbores, 1 of them exploration, newest first.
| Wellbore | Field | Type | Status | Total depth, m | Spud |
|---|---|---|---|---|---|
| 7122/6-3 S | - | Exploration | Plugged and abandoned | 2 015,0 | 16.09.2021 |
| 7122/6-U-1 | - | Other | Plugged | 1 015,0 | 13.09.2021 |
Licensees over time
8 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 14.07.2023 | 10.02.2024 | Vår Energi ASA ; Concedo AS ; Longboat Japex Norge AS ; Equinor Energy AS |
| 28.01.2022 | 13.07.2023 | Vår Energi ASA ; Concedo AS ; Longboat Energy Norge AS ; Equinor Energy AS |
| 31.08.2021 | 27.01.2022 | Vår Energi AS ; Concedo AS ; Longboat Energy Norge AS ; Equinor Energy AS |
| 29.09.2020 | 30.08.2021 | Vår Energi AS ; Equinor Energy AS ; Concedo AS |
| 31.10.2019 | 28.09.2020 | Vår Energi AS ; Equinor Energy AS ; Concedo ASA |
| 10.12.2018 | 30.10.2019 | Equinor Energy AS ; Vår Energi AS ; Concedo ASA |
| 16.05.2018 | 09.12.2018 | Equinor Energy AS ; Eni Norge AS ; Concedo ASA |
| 10.02.2017 | 15.05.2018 | Statoil Petroleum AS ; Eni Norge AS ; Concedo ASA |
Operators over time
| Operator | From | To |
|---|---|---|
| Vår Energi ASA | 28.01.2022 | 10.02.2024 |
| Vår Energi AS | 01.11.2019 | 27.01.2022 |
| Equinor Energy AS | 16.05.2018 | 31.10.2019 |
| Statoil Petroleum AS | 10.02.2017 | 15.05.2018 |