PL 915
Inactive
Production licence 915 was granted 02.03.2018. It ended 01.09.2022. The last operator was Aker BP ASA.
Granted02.03.2018
Ended01.09.2022
Phase-
Licensing roundTFO2017
Area granted57 km²
Area now-
Main areaNorth Sea
OperatorAker BP ASA
Licensees when it ended
| Company | Interest |
|---|---|
| Equinor Energy AS | 50 % |
| Aker BP ASA operator | 35 % |
| Sval Energi AS | 15 % |
Wellbores
No wellbore in the register is drilled in PL 915.
Licensees over time
4 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 31.05.2022 | 01.09.2022 | Equinor Energy AS ; Aker BP ASA ; Sval Energi AS |
| 04.12.2018 | 30.05.2022 | Equinor Energy AS ; Aker BP ASA ; Spirit Energy Norway AS |
| 16.05.2018 | 03.12.2018 | Equinor Energy AS ; Aker BP ASA ; Spirit Energy Norge AS |
| 02.03.2018 | 15.05.2018 | Statoil Petroleum AS ; Aker BP ASA ; Spirit Energy Norge AS |