PL 984 C
ActiveInitial period
Production licence 984 C was granted 20.03.2026. It is in its initial period and valid to 20.03.2032. DNO Norge AS is the operator, with five licensees in all.
Granted20.03.2026
Valid to20.03.2032
PhaseInitial period
Licensing roundTFO2025
Area granted83 km²
Area now83 km²
Main areaNorth Sea
OperatorDNO Norge AS
Licensees
| Company | Interest |
|---|---|
| DNO Norge AS operator | 30 % |
| Equinor Energy AS | 20 % |
| Source Energy AS | 20 % |
| Vår Energi ASA | 20 % |
| Aker BP ASA | 10 % |
Wellbores
No wellbore in the register is drilled in PL 984 C.