4D seabed seismicCompletedNorth Sea

A 4D seabed seismic survey in the North Sea, acquired by Magseis Operations AS for ConocoPhillips Skandinavia AS. Acquired from 21.07.2025 to 01.09.2025.

Planned start22.07.2025
Planned end01.09.2025
Started21.07.2025
Completed01.09.2025
Boat km planned3 000 km
Boat km done2 992 km
Net area planned, 3D and 4D191 km²
Net area acquired, 3D and 4D191 km²
Company doing the surveyMagseis Operations AS
Acquired forConocoPhillips Skandinavia AS
Responsible companyConocoPhillips Skandinavia AS
Legal basisPetroleum regulations
SourceSeismic, 1 source
Offered to the marketNo

Survey area

56,62° N56,46° N3,11 to 3,34° E

The outline spans about 14 km east to west and 19 km north to south. The outline is the net area as reported, simplified to about 200 m.

Vessel

VesselRoleFlagIMO number
Skandi NovaAcquisition vesselNorway9625009

Licence

The licences the survey is acquired under.

PL 018

Weekly progress

From the company's latest weekly report. The register keeps the latest report only, not the weeks before it. Boat km is the distance sailed on line; CDP km is the length of the subsurface lines covered.

57 % of the planned boat km
Latest report covers12.08.2025 to 01.09.2025
Boat km in the period114 km
CDP km in the period-
Boat km so far1 724 km
CDP km so far-

Notices

12 notices filed for the survey, newest first. The notices' own text is in Norwegian and is on FactPages.

DateNotice
01.09.2025Status changed
01.09.2025Survey completed
11.08.2025Period report
04.08.2025Period report
28.07.2025Period report
21.07.2025Status changed
21.07.2025Survey started
16.04.2025Status changed
16.04.2025Directorate of Fisheries on the notification
16.04.2025Offshore Directorate on the notification
02.04.2025Institute of Marine Research on the notification
01.04.2025Status changed