WellplannerNorwegian shelf well data

Seismic / 2016 / ST16221

ST16221

4D seabed seismicCompletedNorth Sea

A 4D seabed seismic survey in the North Sea, acquired by WGP Exploration Ltd. for Statoil Petroleum AS. Acquired from 01.05.2016 to 18.05.2016.

Planned start01.05.2016
Planned end31.05.2016
Started01.05.2016
Completed18.05.2016
Boat km planned1 295 km
Boat km done1 295 km
Net area planned, 3D and 4D-
Net area acquired, 3D and 4D-
Company doing the surveyWGP Exploration Ltd.
Acquired forStatoil Petroleum AS
Responsible companyStatoil Petroleum AS
Legal basisPetroleum regulations
SourceSeismic, 2 sources
SensorsSeabed nodes, 50 m long
Offered to the marketNo

Survey area

59,26° N59,08° N2,37 to 2,61° E

The outline spans about 13 km east to west and 20 km north to south. The outline is the net area as reported, simplified to about 200 m.

Vessel

VesselRoleFlagIMO number
Siddis SailorAcquisition vesselNorway9370070

Licences

The licences the survey is acquired under.

PL 169PL 169 B1PL 169 B2

Weekly progress

From the company's latest weekly report. The register keeps the latest report only, not the weeks before it. Boat km is the distance sailed on line; CDP km is the length of the subsurface lines covered.

100 % of the planned boat km
Boat km in the period1 295 km
CDP km in the period-
Boat km so far1 704 km
CDP km so far-

Notices

11 notices filed for the survey, newest first. The notices' own text is in Norwegian and is on FactPages.

DateNotice
19.05.2016Status changed
19.05.2016Completion notice
09.05.2016Weekly report
03.05.2016Weekly report
02.05.2016Status changed
02.05.2016Start notice
26.02.2016Status changed
26.02.2016Offshore Directorate letter to the companies
24.02.2016Consultation comment, Directorate of Fisheries
22.02.2016Status changed
22.02.2016Consultation comment, Institute of Marine Research
Open on FactPages ↗