Fields / Tambar / 1/3-9 S
1/3-9 S
Exploration, appraisalReclassified to developmentOil
Drilled by BP Norway Limited U.A. with Mærsk Jutlander in Tambar, 08.05.1998 to 31.07.1998 (84 days), to 4 516,0 m in the Ula Formation.
Water depth68,0 m
Total depth4 516,0 m MD
Vertical depth4 359,0 m TVD
Bottom-hole temperature168 °C
Max inclination25,9°
Rotary table23,0 m
Formation at total depthUla Formation
RigMærsk Jutlander
Spud08.05.1998
Completed31.07.1998
OperatorBP Norway Limited U.A.
Position56,9828 N, 2,9587 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 168 °C |
2 released wells in Tambar report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 1/3-K-1 | 0,0 | 4 543,0 | - | - | 1998 |
| 1/3-K-2 | 0,0 | 4 911,0 | - | - | 2018 |
| 1/3-K-2 A | 0,0 | 5 355,0 | - | - | 2018 |
| 1/3-K-2 B | 0,0 | 6 565,0 | - | - | 2021 |
| 1/3-K-4 | 0,0 | 6 436,0 | - | - | 2017 |
| 1/3-K-5 | 0,0 | 5 268,0 | - | - | 2007 |
| 1/3-K-5 A | 0,0 | 6 301,0 | - | - | 2007 |
| 1/3-K-5 B | 0,0 | 5 978,0 | - | - | 2025 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 159,0 | 36" | 165,0 | - |
| Surface casing | 13 3/8" | 1 042,0 | 17 1/2" | 1 050,0 | 1,98 LOT |
| Pilot hole | - | 1 050,0 | 9 7/8" | - | - |
| Intermediate | 9 5/8" | 3 180,0 | 12 1/4" | 3 185,0 | 1,90 LOT |
| Liner | 7" | 4 514,0 | 8 1/2" | 4 516,0 | - |
Mud weight
24 measurements, one dot each, 1,00 to 1,70 g/cm³ against measured depth, oil based mud, water based mud, waterbased.