WellplannerNorwegian shelf well data

Fields / Tambar / 1/3-K-4

1/3-K-4

Development, productionClosedOil

Drilled by Aker BP ASA with Maersk Interceptor in Tambar, 06.11.2017 to 15.12.2017 (39 days), to 6 436,0 m.

Water depth67,4 m
Total depth6 436,0 m MD
Vertical depth4 355,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table70,0 m
Formation at total depth-
RigMaersk Interceptor
Spud06.11.2017
Completed15.12.2017
OperatorAker BP ASA
Position56,9828 N, 2,9588 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-

2 released wells in Tambar report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
1/3-K-50,05 268,0--2007
1/3-K-5 A0,06 301,0--2007
1/3-K-5 B0,05 978,0--2025
1/3-K-20,04 911,0--2018
1/3-K-2 A0,05 355,0--2018
1/3-K-2 B0,06 565,0--2021
1/3-9 S0,04 516,0168 °C1,701998
1/3-K-10,04 543,0--1998

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗