Fields / Tambar Øst / 1/3-K-5 B
1/3-K-5 B
Development, productionProducingOil
Drilled by Aker BP ASA with Noble Invincible in Tambar Øst, 08.01.2025 to 09.02.2025 (32 days), to 5 978,0 m.
Water depth67,4 m
Total depth5 978,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table69,7 m
Formation at total depth-
RigNoble Invincible
Spud08.01.2025
Completed09.02.2025
OperatorAker BP ASA
Position56,9828 N, 2,9588 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
No released well in Tambar Øst reports a bottom-hole temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.