1/3-K-6
Development, productionClosedOil
Drilled by BP Amoco Norge AS with Transocean Nordic in Tambar, 06.06.2001 to 18.08.2001 (73 days), to 5 713,0 m.
Water depth67,4 m
Total depth5 713,0 m MD
Vertical depth4 204,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table50,0 m
Formation at total depth-
RigTransocean Nordic
Spud06.06.2001
Completed18.08.2001
OperatorBP Amoco Norge AS
Position56,9828 N, 2,9588 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
2 released wells in Tambar report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.