Development, productionPluggedGas

Drilled by Talisman Energy Norge AS with Scarabeo 6 in Rev, 25.12.2000 to 09.02.2001 (46 days), to 3 085,0 m.

Water depth87,0 m
Total depth3 085,0 m MD
Vertical depth3 056,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud25.12.2000
Completed09.02.2001
OperatorTalisman Energy Norge AS
Position58,0280 N, 1,9245 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Rev gradient43,0 °C/km
Estimated at total depth from the gradient130 °C

The gradient is the median of 7 released wells in Rev with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/12-120,03 085,0126 °C1,392000
15/12-C-1 AH same well0,03 041,0--2012
15/12-16 S0,02 961,0123 °C-2006
15/12-C-2 H0,02 961,0--2006
15/12-17 A0,13 620,0128 °C1,612007
15/12-17 S0,13 371,0125 °C1,622006
15/12-D-1 H0,13 338,0--2008
15/12-130,83 047,0110 °C1,572003

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗