15/12-C-1 H
Development, productionPluggedGas
Drilled by Talisman Energy Norge AS with Scarabeo 6 in Rev, 25.12.2000 to 09.02.2001 (46 days), to 3 085,0 m.
Water depth87,0 m
Total depth3 085,0 m MD
Vertical depth3 056,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table26,0 m
Formation at total depth-
RigScarabeo 6
Spud25.12.2000
Completed09.02.2001
OperatorTalisman Energy Norge AS
Position58,0280 N, 1,9245 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Rev gradient | 43,0 °C/km |
| Estimated at total depth from the gradient | 130 °C |
The gradient is the median of 7 released wells in Rev with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/12-12 | 0,0 | 3 085,0 | 126 °C | 1,39 | 2000 |
| 15/12-C-1 AH same well | 0,0 | 3 041,0 | - | - | 2012 |
| 15/12-16 S | 0,0 | 2 961,0 | 123 °C | - | 2006 |
| 15/12-C-2 H | 0,0 | 2 961,0 | - | - | 2006 |
| 15/12-17 A | 0,1 | 3 620,0 | 128 °C | 1,61 | 2007 |
| 15/12-17 S | 0,1 | 3 371,0 | 125 °C | 1,62 | 2006 |
| 15/12-D-1 H | 0,1 | 3 338,0 | - | - | 2008 |
| 15/12-13 | 0,8 | 3 047,0 | 110 °C | 1,57 | 2003 |
Casing and formation tests
No casing programme is reported for this wellbore.