WellplannerNorwegian shelf well data

Fields / Rev / 15/12-C-2 H

15/12-C-2 H

Development, productionClosedGas

Drilled by Talisman Energy Norge AS with Mærsk Giant in Rev, 06.02.2006 to 31.03.2006 (53 days), to 2 961,0 m.

Water depth87,0 m
Total depth2 961,0 m MD
Vertical depth2 897,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table40,0 m
Formation at total depth-
RigMærsk Giant
Spud06.02.2006
Completed31.03.2006
OperatorTalisman Energy Norge AS
Position58,0279 N, 1,9244 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Rev gradient43,0 °C/km
Estimated at total depth from the gradient123 °C

The gradient is the median of 7 released wells in Rev with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/12-16 S0,02 961,0123 °C-2006
15/12-120,03 085,0126 °C1,392000
15/12-C-1 AH0,03 041,0--2012
15/12-C-1 H0,03 085,0--2000
15/12-17 A0,13 620,0128 °C1,612007
15/12-17 S0,13 371,0125 °C1,622006
15/12-D-1 H0,13 338,0--2008
15/12-130,83 047,0110 °C1,572003

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗