Fields / Rev / 15/12-D-1 H

15/12-D-1 H

Development, productionClosedGas

Drilled by Talisman Energy Norge AS with Mærsk Giant in Rev, 11.10.2008 to 23.10.2008 (12 days), to 3 338,0 m.

Water depth87,0 m
Total depth3 338,0 m MD
Vertical depth2 834,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table42,5 m
Formation at total depth-
RigMærsk Giant
Spud11.10.2008
Completed23.10.2008
OperatorTalisman Energy Norge AS
Position58,0285 N, 1,9232 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Rev gradient43,0 °C/km
Estimated at total depth from the gradient120 °C

The gradient is the median of 7 released wells in Rev with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/12-17 A0,03 620,0128 °C1,612007
15/12-17 S0,03 371,0125 °C1,622006
15/12-120,13 085,0126 °C1,392000
15/12-C-1 AH0,13 041,0--2012
15/12-C-1 H0,13 085,0--2000
15/12-16 S0,12 961,0123 °C-2006
15/12-C-2 H0,12 961,0--2006
15/12-130,73 047,0110 °C1,572003

Casing and formation tests

No casing programme is reported for this wellbore.