Fields / 15/2-1
15/2-1
Exploration, wildcatPlugged and abandonedOil and gas shows
Drilled by Norsk Hydro Produksjon AS with Nortrym, 26.11.1981 to 24.02.1982 (90 days), to 4 600,0 m in the Zechstein Group.
Water depth109,0 m
Total depth4 600,0 m MD
Vertical depth-
Bottom-hole temperature132 °C
Max inclination8,3°
Rotary table25,0 m
Formation at total depthZechstein Group
RigNortrym
Spud26.11.1981
Completed24.02.1982
OperatorNorsk Hydro Produksjon AS
Position58,7554 N, 1,5946 E
Formations
34 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 132 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 15/5-3 | 3,7 | 5 042,0 | 142 °C | 1,86 | 1980 |
| 15/5-B-1 H | 3,7 | 2 376,0 | - | - | 2001 |
| 15/5-5 | 5,1 | 2 645,0 | 90 °C | 1,25 | 1995 |
| 15/5-A-7 AH | 5,2 | 4 122,0 | - | - | 2012 |
| 15/5-A-7 H | 5,2 | 4 360,0 | - | - | 2007 |
| 15/5-8 A | 5,6 | 4 962,0 | - | - | 2025 |
| 15/5-8 S | 5,6 | 4 666,0 | - | - | 2025 |
| 15/5-A-5 H | 6,0 | 3 840,0 | - | - | 2003 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 196,0 | 36" | 196,0 | - |
| Surface casing | 20" | 653,0 | 26" | 655,0 | 1,72 LOT |
| Intermediate | 13 3/8" | 2 737,0 | 17 1/2" | 2 750,0 | 1,71 LOT |
| Intermediate | 9 5/8" | 3 770,0 | 12 1/4" | 3 786,0 | 1,99 LOT |
| Open hole | - | 4 600,0 | 8 3/8" | 4 600,0 | - |
Mud weight
9 measurements, one dot each, 1,00 to 1,89 g/cm³ against measured depth, waterbased.