WellplannerNorwegian shelf well data

Fields / Gungne / 15/9-15

15/9-15

Exploration, wildcatPlugged and abandonedGas and condensate

Drilled by Den norske stats oljeselskap a.s with Ross Rig (1) in Gungne, 28.05.1982 to 01.08.1982 (65 days), to 3 200,0 m in the Skagerrak Formation.

Water depth83,0 m
Total depth3 200,0 m MD
Vertical depth3 199,0 m TVD
Bottom-hole temperature116 °C
Max inclination2,0°
Rotary table25,0 m
Formation at total depthSkagerrak Formation
RigRoss Rig (1)
Spud28.05.1982
Completed01.08.1982
OperatorDen norske stats oljeselskap a.s
Position58,3021 N, 1,9221 E

Formations

18 tops reported, measured depth in metres.

GroupsNordland Group, top 108,0 mNordland GpHordaland Group, top 1 129,0 mHordaland GpRogaland Group, top 2 208,0 mRogaland GpShetland Group, top 2 418,0 mShetland GpCromer Knoll Group, top 2 719,0 mViking Group, top 2 751,0 mHegre Group, top 2 821,0 mHegre GpFormationsUtsira Formation, top 883,5 mUtsira FmFrigg Formation, top 2 027,0 mFrigg FmBalder Formation, top 2 208,0 mSele Formation, top 2 243,0 mLista Formation, top 2 332,0 mTor Formation, top 2 418,0 mTor FmHod Formation, top 2 606,0 mBlodøks Formation, top 2 672,0 mDraupne Formation, top 2 751,0 mHeather Formation, top 2 806,0 mSkagerrak Formation, top 2 821,0 mSkagerrak Fm1081 0002 0003 0003 200

Temperature

Reported at total depth116 °C

1 released well in Gungne report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-234,23 225,0-1,362009
15/9-244,72 400,0-1,302010
15/9-95,33 044,079 °C1,501981
16/7-46,32 781,096 °C1,401982
16/7-8 S6,62 900,0104 °C1,452002
15/12-37,04 450,0136 °C1,861980
15/9-A-257,34 973,0--2001
15/9-20 S7,33 626,0-1,641994

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"171,536"171,5-
Surface casing20"498,026"515,01,65 LOT
Intermediate13 3/8"1 178,017 1/2"1 192,01,68 LOT
Intermediate9 5/8"2 463,012 1/4"2 478,01,87 LOT
Liner7"3 199,08 1/2"3 200,0-

Mud weight

7 measurements, one dot each, 1,00 to 1,50 g/cm³ against measured depth, waterbased.

1,01,11,21,31,41,501 0002 0003 000350,0 m: 1,11 g/cm³, waterbased515,0 m: 1,09 g/cm³, waterbased1 190,0 m: 1,13 g/cm³, waterbased1 920,0 m: 1,20 g/cm³, waterbased2 435,0 m: 1,21 g/cm³, waterbased2 630,0 m: 1,40 g/cm³, waterbased2 680,0 m: 1,50 g/cm³, waterbased

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
22 830,0 - 2 850,022,0--202510 000
12 880,0 - 2 890,025,0--188467 000
Show on the mapOpen on FactPages ↗