Fields / Sleipner Vest / 15/9-B-1
15/9-B-1
Development, productionClosedGas and condensate
Drilled by StatoilHydro Petroleum AS with West Epsilon in Sleipner Vest, 16.07.2009 to 02.11.2009 (109 days), to 6 069,0 m.
Water depth108,0 m
Total depth6 069,0 m MD
Vertical depth3 808,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table47,7 m
Formation at total depth-
RigWest Epsilon
Spud16.07.2009
Completed02.11.2009
OperatorStatoilHydro Petroleum AS
Position58,4180 N, 1,7178 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Sleipner Vest gradient | 30,0 °C/km |
| Estimated at total depth from the gradient | 113 °C |
The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.