WellplannerNorwegian shelf well data

Fields / Sleipner Vest / 15/9-B-6

15/9-B-6

Development, productionClosedGas

Drilled by Den norske stats oljeselskap a.s with West Epsilon in Sleipner Vest, 05.02.1996 to 25.03.1996 (49 days), to 4 540,0 m.

Water depth108,0 m
Total depth4 540,0 m MD
Vertical depth3 868,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table48,0 m
Formation at total depth-
RigWest Epsilon
Spud05.02.1996
Completed25.03.1996
OperatorDen norske stats oljeselskap a.s
Position58,4179 N, 1,7178 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Sleipner Vest gradient30,0 °C/km
Estimated at total depth from the gradient115 °C

The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-B-100,03 920,0--1995
15/9-B-50,04 800,0--1995
15/9-B-20,07 824,0--2009
15/9-B-70,05 732,0--1996
15/9-B-90,07 515,0--2025
15/9-B-10,06 069,0--2009
15/9-B-110,04 218,0--1998
15/9-B-30,03 764,0--2000

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗