Fields / Sleipner Vest / 15/9-B-2

15/9-B-2

Development, productionClosedGas and condensate

Drilled by Statoil Petroleum AS with West Epsilon in Sleipner Vest, 24.11.2009 to 01.03.2010 (97 days), to 7 824,0 m.

Water depth108,0 m
Total depth7 824,0 m MD
Vertical depth3 632,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table48,0 m
Formation at total depth-
RigWest Epsilon
Spud24.11.2009
Completed01.03.2010
OperatorStatoil Petroleum AS
Position58,4180 N, 1,7178 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Sleipner Vest gradient30,0 °C/km
Estimated at total depth from the gradient108 °C

The gradient is the median of 13 released wells in Sleipner Vest with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
15/9-B-10,06 069,0--2009
15/9-B-30,03 764,0--2000
15/9-B-60,04 540,0--1996
15/9-B-50,04 800,0--1995
15/9-B-70,05 732,0--1996
15/9-B-100,03 920,0--1995
15/9-B-40,06 476,0--1997
15/9-B-4 A0,07 690,0--2017

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗