WellplannerNorwegian shelf well data

Fields / 16/1-35 S

16/1-35 S

Exploration, wildcatPlugged and abandonedDry

Drilled by Aker BP ASA with Scarabeo 8, 07.01.2023 to 28.02.2023 (52 days), to 3 257,0 m in the Skagerrak Formation.

Water depth109,0 m
Total depth3 257,0 m MD
Vertical depth3 184,0 m TVD
Bottom-hole temperature125 °C
Max inclination31,0°
Rotary table33,7 m
Formation at total depthSkagerrak Formation
RigScarabeo 8
Spud07.01.2023
Completed28.02.2023
OperatorAker BP ASA
Position58,8599 N, 2,1359 E

Formations

32 tops reported, measured depth in metres.

GroupsNordland Group, top 143,0 mNordland GpHordaland Group, top 944,0 mHordaland GpRogaland Group, top 2 042,0 mRogaland GpShetland Group, top 2 364,5 mViking Group, top 2 392,0 mViking GpStatfjord Group, top 3 097,5 mHegre Group, top 3 177,0 mFormationsUndifferentiated, top 143,0 mUndifferentiatedNo Formal Name, top 261,0 mNo Formal NameUtsira Formation, top 788,0 mUtsira FmUndifferentiated, top 944,0 mSkade Formation, top 1 008,0 mSkade FmUndifferentiated, top 1 271,0 mUndifferentiatedGrid Formation, top 1 675,5 mGrid FmUndifferentiated, top 1 826,5 mUndifferentiatedBalder Formation, top 2 042,0 mSele Formation, top 2 093,0 mLista Formation, top 2 177,5 mHeimdal Formation, top 2 212,0 mLista Formation, top 2 287,5 mVåle Formation, top 2 300,0 mTy Formation, top 2 308,0 mVåle Formation, top 2 332,0 mEkofisk Formation, top 2 364,5 mTor Formation, top 2 371,0 mIntra Draupne Fm Ss, top 2 392,0 mIntra Draupne Fm SsUndifferentiated, top 2 537,0 mIntra Draupne Fm Ss, top 2 594,0 mIntra Draupne Fm SsHeather Formation, top 2 754,0 mHeather FmHugin Formation, top 2 966,0 mHugin FmEiriksson Formation, top 3 097,5 mSkagerrak Formation, top 3 177,0 m1431 0002 0003 0003 257

Temperature

Reported at total depth125 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
16/1-U-110,01 501,0--2023
16/1-274,42 258,095 °C1,352017
16/1-144,82 550,099 °C1,502010
16/1-U-64,8606,0--2010
16/1-22 A5,42 896,0-1,352015
16/1-22 B5,43 215,0-1,342015
16/1-22 S5,42 640,0102 °C1,242015
16/1-86,32 200,087 °C1,252007

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"202,536"204,8-
Intermediate13 3/8"1 478,017 1/2"1 484,01,73 LOT
Liner9 5/8"2 123,512 1/4"2 127,01,71 XLO
Open hole-3 257,08 1/2"3 257,0-

Mud weight

8 measurements, one dot each, 1,00 to 1,30 g/cm³ against measured depth, synthetic, water.

1,01,11,21,301 0002 0003 000182,0 m: 1,03 g/cm³, Water1 300,0 m: 1,30 g/cm³, Water1 782,0 m: 1,30 g/cm³, Synthetic2 127,0 m: 1,30 g/cm³, Synthetic2 321,0 m: 1,30 g/cm³, Synthetic2 522,0 m: 1,30 g/cm³, Synthetic2 867,0 m: 1,30 g/cm³, Synthetic3 257,0 m: 1,30 g/cm³, Synthetic
Show on the mapOpen on FactPages ↗