WellplannerNorwegian shelf well data

Fields / Ivar Aasen / 16/1-D-14

16/1-D-14

Development, productionProducingOil

Drilled by Det norske oljeselskap ASA with Maersk Interceptor in Ivar Aasen, 20.10.2015 to 12.11.2015 (23 days), to 4 619,0 m.

Water depth112,7 m
Total depth4 619,0 m MD
Vertical depth2 480,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table58,0 m
Formation at total depth-
RigMaersk Interceptor
Spud20.10.2015
Completed12.11.2015
OperatorDet norske oljeselskap ASA
Position58,9223 N, 2,1981 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ivar Aasen gradient39,1 °C/km
Estimated at total depth from the gradient94 °C

The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
16/1-U-70,01 530,0--2012
16/1-D-130,04 385,0--2021
16/1-D-13 A0,04 770,0--2022
16/1-D-100,04 664,0--2015
16/1-D-15 Y10,05 035,0--2019
16/1-D-15 Y20,04 810,0--2019
16/1-D-15 Y30,04 810,0--2019
16/1-D-180,03 250,0--2019

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗