WellplannerNorwegian shelf well data

Fields / Ivar Aasen / 16/1-D-15 Y2

16/1-D-15 Y2

Development, productionPluggedDry

Drilled by Aker BP ASA with Maersk Interceptor in Ivar Aasen, 25.07.2019 to 02.08.2019 (8 days), to 4 810,0 m.

Water depth112,7 m
Total depth4 810,0 m MD
Vertical depth2 442,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table68,3 m
Formation at total depth-
RigMaersk Interceptor
Spud25.07.2019
Completed02.08.2019
OperatorAker BP ASA
Position58,9223 N, 2,1982 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Ivar Aasen gradient39,1 °C/km
Estimated at total depth from the gradient92 °C

The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
16/1-D-15 Y1 same well0,05 035,0--2019
16/1-D-15 Y3 same well0,04 810,0--2019
16/1-U-70,01 530,0--2012
16/1-D-160,06 217,0--2015
16/1-D-110,04 294,0--2015
16/1-D-11 A0,05 090,0--2015
16/1-D-140,04 619,0--2015
16/1-D-190,04 861,0--2016

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗