Fields / Ivar Aasen / 16/1-D-15 Y1
16/1-D-15 Y1
Development, productionProducingOil
Drilled by Aker BP ASA with Maersk Interceptor in Ivar Aasen, 04.07.2019 to 24.07.2019 (20 days), to 5 035,0 m.
Water depth112,7 m
Total depth5 035,0 m MD
Vertical depth2 450,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table68,3 m
Formation at total depth-
RigMaersk Interceptor
Spud04.07.2019
Completed24.07.2019
OperatorAker BP ASA
Position58,9223 N, 2,1982 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ivar Aasen gradient | 39,1 °C/km |
| Estimated at total depth from the gradient | 93 °C |
The gradient is the median of 6 released wells in Ivar Aasen with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 16/1-D-15 Y2 same well | 0,0 | 4 810,0 | - | - | 2019 |
| 16/1-D-15 Y3 same well | 0,0 | 4 810,0 | - | - | 2019 |
| 16/1-U-7 | 0,0 | 1 530,0 | - | - | 2012 |
| 16/1-D-16 | 0,0 | 6 217,0 | - | - | 2015 |
| 16/1-D-11 | 0,0 | 4 294,0 | - | - | 2015 |
| 16/1-D-11 A | 0,0 | 5 090,0 | - | - | 2015 |
| 16/1-D-14 | 0,0 | 4 619,0 | - | - | 2015 |
| 16/1-D-19 | 0,0 | 4 861,0 | - | - | 2016 |
Casing and formation tests
No casing programme is reported for this wellbore.