Fields / 16/2-18 S
16/2-18 S
Exploration, appraisalPlugged and abandonedOil
Drilled by Statoil Petroleum AS with Ocean Vanguard, 05.07.2013 to 08.08.2013 (34 days), to 1 970,0 m in the Basement.
Water depth112,0 m
Total depth1 970,0 m MD
Vertical depth1 969,0 m TVD
Bottom-hole temperature83 °C
Max inclination6,6°
Rotary table22,0 m
Formation at total depthBasement
RigOcean Vanguard
Spud05.07.2013
Completed08.08.2013
OperatorStatoil Petroleum AS
Position58,8324 N, 2,4642 E
Formations
27 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 83 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 16/2-U-14 | 3,2 | 1 050,0 | - | - | 2012 |
| 16/2-14 | 3,2 | 1 982,0 | 85 °C | 1,60 | 2012 |
| 16/2-U-19 | 4,4 | 2 017,0 | 86 °C | 1,26 | 2016 |
| 16/2-8 | 4,8 | 2 140,0 | 81 °C | 1,25 | 2011 |
| 16/2-17 A | 4,9 | - | - | - | - |
| 16/2-17 B | 4,9 | 2 200,0 | - | 1,45 | 2013 |
| 16/2-17 S | 4,9 | 2 052,0 | 81 °C | 1,60 | 2013 |
| 16/2-U-17 | 4,9 | 409,0 | - | - | 2013 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 197,0 | 36" | 201,0 | - |
| Pilot hole | - | 455,0 | 9 7/8" | 455,0 | - |
| Surface casing | 13 3/8" | 848,0 | 17 1/2" | 855,0 | 1,55 FIT |
| Intermediate | 9 5/8" | 1 628,0 | 12 1/4" | 1 629,0 | 1,62 LOT |
| Open hole | - | 1 970,0 | 8 1/2" | 1 970,0 | - |
Mud weight
7 measurements, one dot each, 1,20 to 1,35 g/cm³ against measured depth, kcl/polymer/gem, kcl/polymer/glycol, spud mud.