Fields / 2/1-2
2/1-2
Exploration, wildcatPlugged and abandonedDry
Drilled by BP Norway Limited U.A. with Norskald, 14.12.1977 to 26.02.1978 (74 days), to 3 555,5 m in the Zechstein Group.
Water depth70,0 m
Total depth3 555,5 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination3,5°
Rotary table24,0 m
Formation at total depthZechstein Group
RigNorskald
Spud14.12.1977
Completed26.02.1978
OperatorBP Norway Limited U.A.
Position56,9585 N, 3,2089 E
Formations
20 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 169,0 | 36" | 174,0 | - |
| Surface casing | 20" | 557,0 | 26" | 562,0 | - |
| Intermediate | 13 3/8" | 2 226,0 | 17 1/2" | 2 231,0 | - |
| Intermediate | 9 5/8" | 3 138,0 | 12 1/4" | 3 140,0 | - |
| Open hole | - | 3 551,0 | 8 1/2" | 3 551,0 | - |
Mud weight
8 measurements, one dot each, 1,40 to 1,56 g/cm³ against measured depth, waterbased.