Fields / Gyda / 2/1-3
2/1-3
Exploration, wildcatPlugged and abandonedOil
Drilled by BP Norway Limited U.A. with Sedco H in Gyda, 03.11.1979 to 29.03.1980 (147 days), to 4 297,0 m in the Zechstein Group.
Water depth66,0 m
Total depth4 297,0 m MD
Vertical depth4 296,0 m TVD
Bottom-hole temperature162 °C
Max inclination3,0°
Rotary table30,0 m
Formation at total depthZechstein Group
RigSedco H
Spud03.11.1979
Completed29.03.1980
OperatorBP Norway Limited U.A.
Position56,9115 N, 3,1084 E
Formations
25 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 162 °C |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 160 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 2/1-U-8 | 1,6 | 170,6 | - | - | 1987 |
| 2/1-A-1 | 1,6 | 4 900,0 | - | - | 1989 |
| 2/1-A-2 | 1,6 | 5 060,0 | - | - | 1989 |
| 2/1-A-2 A | 1,6 | 5 289,0 | - | - | 2007 |
| 2/1-A-3 | 1,6 | 4 747,0 | - | - | 1988 |
| 2/1-A-4 | 1,6 | 4 550,0 | - | - | 1988 |
| 2/1-A-5 | 1,6 | 4 595,0 | - | - | 1988 |
| 2/1-A-6 | 1,6 | 4 897,0 | - | - | 1988 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 139,0 | 36" | 143,0 | - |
| Surface casing | 18 5/8" | 595,0 | 24" | 608,0 | 1,81 LOT |
| Intermediate | 13 3/8" | 1 899,0 | 17 1/2" | 1 910,0 | 1,92 LOT |
| Intermediate | 9 5/8" | 3 558,0 | 12 1/4" | 3 566,0 | 2,00 LOT |
| Liner | 7" | 3 935,0 | 8 1/2" | 4 267,0 | - |
Mud weight
6 measurements, one dot each, 1,10 to 1,68 g/cm³ against measured depth, waterbased.
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|
| 3 | 3 819,0 - 3 825,1 | 12,7 | - | - | 933 | 39 000 |
| 2 | 3 838,5 - 3 844,6 | 12,7 | - | - | 1 051 | 55 000 |
| 1 | 3 863,0 - 3 872,0 | 15,9 | - | - | 226 | 19 000 |