2/1-A-32 B
Development, productionPluggedOil
Drilled by Talisman Energy Norge AS with Gyda in Gyda, 08.06.2008 to 08.07.2008 (30 days), to 4 438,0 m.
Water depth65,5 m
Total depth4 438,0 m MD
Vertical depth4 200,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud08.06.2008
Completed08.07.2008
OperatorTalisman Energy Norge AS
Position56,9048 N, 3,0850 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 155 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/1-A-32 same well | 0,0 | 5 897,0 | - | - | 1994 |
| 2/1-A-32 A same well | 0,0 | 6 134,0 | - | - | 2006 |
| 2/1-A-32 C same well | 0,0 | 6 939,0 | - | - | 2012 |
| 2/1-A-32 D same well | 0,0 | 8 408,0 | - | - | 2013 |
| 2/1-A-28 | 0,0 | 4 968,0 | - | - | 1995 |
| 2/1-A-28 A | 0,0 | 4 850,0 | - | - | 2008 |
| 2/1-A-31 | 0,0 | 5 074,0 | - | - | 1993 |
| 2/1-A-31 A | 0,0 | 6 705,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.