2/1-A-32
Development, injectionPluggedWater
Drilled by BP Norway Limited U.A. with Gyda in Gyda, 20.05.1994 to 03.08.1994 (75 days), to 5 897,0 m.
Water depth66,0 m
Total depth5 897,0 m MD
Vertical depth4 255,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,0 m
Formation at total depth-
RigGyda
Spud20.05.1994
Completed03.08.1994
OperatorBP Norway Limited U.A.
Position56,9048 N, 3,0850 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Gyda gradient | 37,0 °C/km |
| Estimated at total depth from the gradient | 157 °C |
The gradient is the median of 6 released wells in Gyda with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/1-A-32 A same well | 0,0 | 6 134,0 | - | - | 2006 |
| 2/1-A-32 B same well | 0,0 | 4 438,0 | - | - | 2008 |
| 2/1-A-32 C same well | 0,0 | 6 939,0 | - | - | 2012 |
| 2/1-A-32 D same well | 0,0 | 8 408,0 | - | - | 2013 |
| 2/1-A-28 | 0,0 | 4 968,0 | - | - | 1995 |
| 2/1-A-28 A | 0,0 | 4 850,0 | - | - | 2008 |
| 2/1-A-31 | 0,0 | 5 074,0 | - | - | 1993 |
| 2/1-A-31 A | 0,0 | 6 705,0 | - | - | 2005 |
Casing and formation tests
No casing programme is reported for this wellbore.