Fields / 2/1-U-11
2/1-U-11
Other, soil drillingPlugged and abandoned
Drilled by BP Petroleum Dev. of Norway AS with Bucentaur, 26.04.1987 to 27.04.1987 (1 days), to 103,0 m.
Water depth67,1 m
Total depth103,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud26.04.1987
Completed27.04.1987
OperatorBP Petroleum Dev. of Norway AS
Position56,9045 N, 3,0846 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/1-U-6 | 0,0 | 75,6 | - | - | 1987 |
| 2/1-A-29 | 0,0 | 6 211,0 | - | - | 1997 |
| 2/1-A-30 | 0,0 | 5 699,0 | - | - | 1993 |
| 2/1-A-30 A | 0,0 | 5 747,0 | - | - | 1993 |
| 2/1-A-31 | 0,0 | 5 074,0 | - | - | 1993 |
| 2/1-A-31 A | 0,0 | 6 705,0 | - | - | 2005 |
| 2/1-A-32 | 0,0 | 5 897,0 | - | - | 1994 |
| 2/1-A-32 A | 0,0 | 6 134,0 | - | - | 2006 |
Casing and formation tests
No casing programme is reported for this wellbore.