2/11-10 S
Exploration, wildcatReclassified to developmentOil
Drilled by Amoco Norway Oil Company with Mærsk Giant in Hod, 28.02.1994 to 14.06.1994 (106 days), to 4 090,0 m in the Hod Formation.
Water depth72,0 m
Total depth4 090,0 m MD
Vertical depth2 920,0 m TVD
Bottom-hole temperature102 °C
Max inclination60,9°
Rotary table47,0 m
Formation at total depthHod Formation
RigMærsk Giant
Spud28.02.1994
Completed14.06.1994
OperatorAmoco Norway Oil Company
Position56,1765 N, 3,4602 E
Formations
11 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 102 °C |
| Hod gradient | 35,4 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/11-A-5 | 0,0 | 4 090,0 | - | - | 1994 |
| 2/11-A-5 A | 0,0 | 4 658,0 | - | - | 1994 |
| 2/11-A-4 | 0,0 | 4 100,0 | - | - | 1990 |
| 2/11-A-8 | 0,0 | 3 712,0 | - | - | 1995 |
| 2/11-A-8 A | 0,0 | 4 611,0 | - | - | 1995 |
| 2/11-6 S | 0,0 | 4 076,0 | 111 °C | 1,88 | 1981 |
| 2/11-6 SR | 0,0 | 4 088,3 | - | - | 1990 |
| 2/11-A-6 | 0,0 | 4 070,0 | - | - | 1990 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 200,0 | 36" | 200,0 | - |
| Surface casing | 20" | 385,0 | 26" | 385,0 | - |
| Intermediate | 13 3/8" | 1 587,0 | 16" | 1 587,0 | - |
| Intermediate | 9 5/8" | 3 911,0 | 12 1/4" | 3 911,0 | - |
| Liner | 7" | 4 090,0 | 8 1/2" | 4 090,0 | - |
Mud weight
11 measurements, one dot each, 1,10 to 1,76 g/cm³ against measured depth, oil based, water based.