2/11-A-5
Development, productionPluggedOil
Drilled by Amoco Norway Oil Company with Mærsk Giant in Hod, 28.02.1994 to 14.06.1994 (106 days), to 4 090,0 m.
Water depth72,0 m
Total depth4 090,0 m MD
Vertical depth2 919,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table47,0 m
Formation at total depth-
RigMærsk Giant
Spud28.02.1994
Completed14.06.1994
OperatorAmoco Norway Oil Company
Position56,1765 N, 3,4602 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Hod gradient | 35,4 °C/km |
| Estimated at total depth from the gradient | 103 °C |
The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 2/11-10 S | 0,0 | 4 090,0 | 102 °C | 1,76 | 1994 |
| 2/11-A-5 A same well | 0,0 | 4 658,0 | - | - | 1994 |
| 2/11-A-4 | 0,0 | 4 100,0 | - | - | 1990 |
| 2/11-A-8 | 0,0 | 3 712,0 | - | - | 1995 |
| 2/11-A-8 A | 0,0 | 4 611,0 | - | - | 1995 |
| 2/11-6 S | 0,0 | 4 076,0 | 111 °C | 1,88 | 1981 |
| 2/11-6 SR | 0,0 | 4 088,3 | - | - | 1990 |
| 2/11-A-6 | 0,0 | 4 070,0 | - | - | 1990 |
Casing and formation tests
No casing programme is reported for this wellbore.