WellplannerNorwegian shelf well data

Fields / Hod / 2/11-A-5 A

2/11-A-5 A

Development, productionPlugged and abandonedOil

Drilled by Amoco Norway Oil Company with Mærsk Giant in Hod, 03.08.1994 to 02.09.1994 (30 days), to 4 658,0 m.

Water depth72,0 m
Total depth4 658,0 m MD
Vertical depth2 818,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table47,0 m
Formation at total depth-
RigMærsk Giant
Spud03.08.1994
Completed02.09.1994
OperatorAmoco Norway Oil Company
Position56,1765 N, 3,4602 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Hod gradient35,4 °C/km
Estimated at total depth from the gradient100 °C

The gradient is the median of 6 released wells in Hod with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
2/11-10 S0,04 090,0102 °C1,761994
2/11-A-5 same well0,04 090,0--1994
2/11-A-40,04 100,0--1990
2/11-A-80,03 712,0--1995
2/11-A-8 A0,04 611,0--1995
2/11-6 S0,04 076,0111 °C1,881981
2/11-6 SR0,04 088,3--1990
2/11-A-60,04 070,0--1990

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗